Optimalisasi Produksi Alat Gali Muat CAT330GC-318 Dengan Metode Overall Equipment Effectiveness Serta Six Big Losses Pada Pengupasan Overburden PT Caritas Energi Indonesia, Kabupaten Sarolangun, Jambi

Setiawan, Ari (2021) Optimalisasi Produksi Alat Gali Muat CAT330GC-318 Dengan Metode Overall Equipment Effectiveness Serta Six Big Losses Pada Pengupasan Overburden PT Caritas Energi Indonesia, Kabupaten Sarolangun, Jambi. S1 thesis, Mahasiswa.

[img] Text
Skripsi Ari Setiawan (F1D115030) REVISI.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text
Cover.pdf

Download (95kB)
[img] Text
Halaman Pengesahan.pdf

Download (123kB)
[img] Text
Ringkasan.pdf

Download (125kB)
[img] Text
Bab 1 Pendahuluan.pdf

Download (162kB)
[img] Text
Bab 5 Kesimpulan dan Saran.pdf

Download (127kB)
[img] Text
Daftar Pustaka.pdf

Download (164kB)
Official URL: https://online-journal.unja.ac.id/jtk/authorDashbo...

Abstract

PT Caritas Energi Indonesia conducts mining using the open pit mining method. PT Caritas Energi Indonesia experienced problems with not achieving production targets. Based on the actual production of PT Caritas Energi Indonesia obtained on the CAT330 Excavator, the average productivity value in July 2021 is 64.745,73 BCM. As for the production of the calculation results of the overall equipment effectiveness value of the CAT330 Excavator in July 2021 with a cumulative percentage of 0.67%, this means that the effectiveness of the CAT330 Excavator in July 2021 is 67%. Then the production calculation based on the overall equipment effectiveness method is obtained with an average productivity in July 2021 for the CAT330 Excavator for 93,225.90 BCM. For the calculation of the analysis of the six big losses, the most dominant loss is reduced speed losses with a cumulative percentage of 98.5%. PT Caritas Energi Indonesia has a production plan target per month with a range of 100,000.00 BCM. So improvements or changes are needed with an increase in the cycletime plan but the use of tools based on the overall equipment effectiveness method is still with a cumulative percentage below the standard <85% with a cumulative percentage of results obtained after repairs of 70%. However, for the production achievement after repair of 104,195.52 BCM, it exceeds the production plan target of PT Caritas Energi Indonesia.

Type: Thesis (S1)
Subjects: L Education > LB Theory and practice of education
Divisions: Fakultas Sains dan Teknologi > Teknik Pertambangan
Depositing User: SETIAWAN
Date Deposited: 21 Dec 2021 03:55
Last Modified: 21 Dec 2021 03:55
URI: https://repository.unja.ac.id/id/eprint/28921

Actions (login required)

View Item View Item