Pra Rancangan Pabrik Pembuatan Karbon Aktif dari Serat Kelapa Sawit (SKS) Menggunakan Proses Karbonisasi dengan Kapasitas 85.000 ton/tahun

Indriatmiko, Velic (2021) Pra Rancangan Pabrik Pembuatan Karbon Aktif dari Serat Kelapa Sawit (SKS) Menggunakan Proses Karbonisasi dengan Kapasitas 85.000 ton/tahun. S1 thesis, UNIVERSITAS JAMBI.

[img] Text
ABSTRAK.pdf

Download (22kB)
[img] Text
BAB I.pdf

Download (305kB)
[img] Text
BAB V.pdf

Download (122kB)
[img] Text
COVER.pdf

Download (18kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (128kB)
[img] Text
FULL SKRIPSI.pdf
Restricted to Repository staff only

Download (3MB)
[img] Text
pengesahan velic.pdf

Download (422kB)
Official URL: https://repository.unja.ac.id/

Abstract

ESSENCE This activated carbon manufacturing plant with a capacity of 85,000 tons/year planned to be established in 2025 in Kp. Singkep, West Sabak District., East Tanjung Jabung Regency, Jambi Province, covering an area of ​​3.9 ha. The process of making activated carbon from this palm fiber raw material using the process of carbonization, physical activation and chemical activation with using hydrochloric acid activator. Activated carbon manufacturing operating conditions of palm fiber in the carbonization process is 350oC and a pressure of 1 atm. Reaction what happens as follows: 1. Cellulose Breakdown 2C6H10O5 4C + CH3COOH + CO2 + H2O + CH3OH + 5H2 + 4CO 2. Lignin Decomposition C15H14O4 6C + C6H5OH + CO + CO2 + CH4 + 2H2 3. Decomposition of Hemicellulose 2C5H8O4 4C + C2H5OH + CH3OH + 2CO2 + CO + 2H2 + H2O This activated carbon manufacturing company is in the form of a company Limited (PT) with the head of which is the president director. Organizational system This company is line and staff with 144 employees person. The results of the pre-planned economic analysis of the Activated Carbon Manufacturing Plant this as follows:  Investment : US$ 129,648,777,8092  Sales per year: US$ 1,983,356,086.4929  Production cost per year: US$ 1,204,095,481,3503  Net profit per year: US$ 779,260,605,1426  Payout time: 3.2 years  Rate of return on investment: 28.85%  Break event points: 29.39%  Service life: 11 years ESSENCE This activated carbon manufacturing plant with a capacity of 85,000 tons/year planned to be established in 2025 in Kp. Singkep, West Sabak District., East Tanjung Jabung Regency, Jambi Province, covering an area of ​​3.9 ha. The process of making activated carbon from this palm fiber raw material using the process of carbonization, physical activation and chemical activation with using hydrochloric acid activator. Activated carbon manufacturing operating conditions of palm fiber in the carbonization process is 350oC and a pressure of 1 atm. Reaction what happens as follows: 1. Cellulose Breakdown 2C6H10O5 4C + CH3COOH + CO2 + H2O + CH3OH + 5H2 + 4CO 2. Lignin Decomposition C15H14O4 6C + C6H5OH + CO + CO2 + CH4 + 2H2 3. Decomposition of Hemicellulose 2C5H8O4 4C + C2H5OH + CH3OH + 2CO2 + CO + 2H2 + H2O This activated carbon manufacturing company is in the form of a company Limited (PT) with the head of which is the president director. Organizational system This company is line and staff with 144 employees person. The results of the pre-planned economic analysis of the Activated Carbon Manufacturing Plant this as follows:  Investment : US$ 129,648,777,8092  Sales per year: US$ 1,983,356,086.4929  Production cost per year: US$ 1,204,095,481,3503  Net profit per year: US$ 779,260,605,1426  Payout time: 3.2 years  Rate of return on investment: 28.85%  Break event points: 29.39%  Service life: 11 years

Type: Thesis (S1)
Subjects: L Education > L Education (General)
Divisions: Fakultas Teknik > Teknik Kimia
Depositing User: INDRIATMIKO
Date Deposited: 04 Jan 2022 04:02
Last Modified: 04 Jan 2022 04:02
URI: https://repository.unja.ac.id/id/eprint/29799

Actions (login required)

View Item View Item