Apriani, Adevia (2022) EVALUASI KINERJA LIMESTONE CRUSHER VI PADA BULAN DESEMBER 2021 DI PT. SEMEN PADANG. S1 thesis, Universitas Jambi.
![]() |
Text
BAB I.pdf Download (83kB) |
![]() |
Text
BAB V.pdf Download (89kB) |
![]() |
Text
COVER.pdf Download (70kB) |
![]() |
Text
DAFTAR PUSTAKA.pdf Download (75kB) |
![]() |
Text
FULL SKRIPSI.pdf Download (3MB) |
![]() |
Text
HALAMAN PENGESAHAN.pdf Download (905kB) |
Abstract
Dalam melakukan produksi pembuatan semen, PT. Semen Padang melakukan penambangan limestone, yang mana limestone merupakan salah satu bahan baku utama dalam pembuatan semen. Limestone yang telah dilakukan penambangan kemudian dilakukan pengecilan ukuran menggunakan crusher lalu diangkut menuju storage menggunakan belt conveyor sebelum dilakukan pengolahan menjadi produk berupa semen. Limestone crusher (LSC) VI merupakan crusher utama atau disebut dengan King Crusher dengan tipe hammer crusher. Target produksi dari limestone crusher VI pada bulan Desember 2021 yaitu sebesar 731.600 ton/bulan dengan jam kerja rencana sebesar 443,1 jam/bulan, namun produksi aktual yang tercapai hanya sebesar 589.580 ton/bulan dengan jam kerja efektif sebesar 325,2 jam. Penelitian ini dilakukan untuk mengevaluasi kinerja limestone crusher VI, megetahui penyebab ketidaktercapainya target produksi dan melakukan perbaikan atas masalah yang terjadi. Adanya waktu hambatan yang terjadi menjadi salah satu penyebab tidak tercapainya target produksi. Hambatan berupa waktu standby menyebabkan adanya energi listrik yang terbuang sia-sia. Dengan dilakukan perbaikan terhadap waktu hambatan pada limestone crusher VI menggunakan metode statistik, efisiensi kerja dari limestone crusher VI meningkat dari 73,39% menjadi 84,65%. Total produksi dari limestone crusher VI juga meningkat menjadi 680.056 ton dan dapat menghemat biaya pengunaan listrik. In carrying out the production of cement manufacture, PT. Semen Padang mining limestone, where limestone is one of the main raw materials in the manufacture of cement. Limestone that has been mined is then reduced in size using a crusher and then transported to storage using a belt conveyor before being processed into a cement product. Limestone crusher VI is the crusher called King Crusher with hammer crusher type. The production target of limestone crusher VI in December 2021 is 731,600 tons/month with planned working hours of 443.1 hours/month, but the actual production achieved is only 589,580 tons/month with effective working hours of 325.2 hours. This research was conducted to evaluate the performance of limestone crusher VI, to find out the causes of the failure to achieve production targets, and to make improvements to the problems that occurred. The existence of time constraints that occur is one of the causes of not achieving production targets. Barriers in the form of standby cause electrical energy to be wasted. By improving the resistance time on the limestone crusher VI using statistical methods, the working efficiency of the limestone crusher VI increased from 73.39% to 84.65%. The total production of limestone crusher VI also increased to 680,056 tons and could save electricity costs.
Type: | Thesis (S1) |
---|---|
Uncontrolled Keywords: | Limestone Crusher VI, Produksi, Waktu Hambatan |
Subjects: | L Education > L Education (General) |
Divisions: | Fakultas Sains dan Teknologi > Teknik Pertambangan |
Depositing User: | APRIANI |
Date Deposited: | 14 Sep 2022 06:39 |
Last Modified: | 14 Sep 2022 06:39 |
URI: | https://repository.unja.ac.id/id/eprint/39419 |
Actions (login required)
![]() |
View Item |