Nabila, Loewina Putri (2024) Kajian Biaya Peledakan Terhadap Geometri Peledakan Untuk Mencapai Target Massa Batuan Terbongkar dan Fragmentasi Pada Proses Pembongkaran Batu Kapur di PT. Semen Padang. S1 thesis, Universitas Jambi.
![]() |
Text
Abstrak.pdf Download (542kB) |
![]() |
Text
BAB 1.pdf Download (1MB) |
![]() |
Text
BAB V.pdf Download (322kB) |
![]() |
Text
COVER.pdf Download (387kB) |
![]() |
Text
DAFTAR PUSTAKA.pdf Download (344kB) |
![]() |
Text
SKRIPSI SIDANG WINAAA.pdf Download (2MB) |
![]() |
Text
HALAMAN PENGESAHAN.pdf Download (280kB) |
Abstract
PT Semen Padang memiliki target produksi sebesar 7.089.908 ton/tahun. Penelitian ini dilakukan pada lokasi PNBP (Penerimaan Negara Bukan Pajak). Pada bulan Juni target massa batuan terbongkar tidak tercapai. Kajian biaya peledakan diperlukan untuk mendapatkan biaya yang optimal dan efisien dan dibandingkan dengan usulan biaya. Tujuan penelitian ini untuk mengetahui ge- ometri yang disarankan agar mendapatkan hasil fragmentasi yang sesuai dengan ketentuan perusahaan,biaya peledakan aktual dengan usulan, mengetahui biaya tiap lubang ledak tiap kali peledakan dan mengetahui perbandingan jumlah lubang ledak dan massa batuan terbongkar aktual dan usulan. Untuk menge- tahui perbandingan biaya peledakan dilakukan dengan usulan menggunakan ru- musan Anderson. Yang diperhatikan tidak hanya biaya, namun massa batuan yang diledakkan, geometri peledakan dan fragmentasi batuan. Maka didapat biaya yang optimal dan efisien menggunakan rumusan Anderson. Biaya pele- dakan aktual sebanyak 15 kali peledakan sebesar Rp. 2.029.677.600 dengan jumlah lubang ledak sebanyak 1.050 lubang, burden 3,7 m, spasi 4 m, stemming 4 m, panjang kolom isian 7 m, handak 126.000 kg dan jumlah batuan terbongkar 465.521 tidak tercapai dengan target bulan Juni sebesar 675.273 sedangkan biaya peledakan usulan sebesar Rp. 1.968.859.676 dengan jumlah lubang 1.130 lubang, burden 4,3 m, spasi 4,9 m, stemming 4,3 m, handak 118.679 kg dan jumlah batuan terbongkar 675.273. Untuk biaya tiap lubang ledak tiap kali pele- dakan aktual sebesar Rp. 1.931.754 dengan perbandingan biaya jumlah lubang peledakan dengan teori Anderson sebesar Rp. 1.740.583. Untuk hasil fragmentasi pada peledakan aktual fragmentasi yang lolos 80% diukuran 40,41 cm sedangkan usulan fragmentasi yang lolos P80% diukuran 80 cm. Kata Kunci : Biaya peledakan, Geometri, Fragmentasi, Lubang Ledak. PT Semen Padang has a production target of 7,089,908 tons/year. This re- search was conducted at the PNBP (Non-Tax State Revenue) location. In June the target for dismantling the rock mass was not achieved. A study of blasting costs is needed to obtain optimal and efficient costs and compare them with the proposed costs. The aim of this research is to find out the recommended geometry in order to get fragmentation results that are in accordance with company regulations, the ac- tual and proposed blasting costs, find out the cost of each blast hole per blast and find out the comparison of the number of blast holes and the mass of actual and proposed exposed rock. To find out the comparison of blasting costs, it is proposed to use Anderson's formula. What is considered is not only cost, but the mass of rock blasted, blasting geometry and rock fragmentation. So optimal and efficient costs are obtained using Anderson's formula. The actual blasting cost for 15 blasts is IDR. 2,029,677,600 with a total of 1,050 blast holes, 4.3 m of burden, 4 m of spacing, 4 m of stemming, 7.2 m of filling column length, 126,000 kg of explosives and 465,552 of exposed rock, which was not achieved with the June target of 675,273 while The proposed blasting cost is IDR. 1,968,859,676 with a total of 1,130 holes, 4.3 m bur- den, 4.9 m spacing, 4.3 m stemming, 118,679 kg of explosives and 675,273 exposed rocks. The cost of each blast hole per actual blasting is Rp. 1,931,754 with a com- parison of the cost of the number of blasting holes with Anderson's theory of Rp. 1,740,583. For the fragmentation results in the actual detonation, the fragmentation that passed 80% measured 40.41 cm, while the proposed fragmentation that passed P80 measured 80 cm. Keywords: Blasting costs, Geometry, Fragmentation, Blast Hole.
Type: | Thesis (S1) |
---|---|
Subjects: | L Education > L Education (General) |
Divisions: | Fakultas Sains dan Teknologi > Teknik Pertambangan |
Depositing User: | Nabila |
Date Deposited: | 22 Jan 2024 03:15 |
Last Modified: | 22 Jan 2024 03:15 |
URI: | https://repository.unja.ac.id/id/eprint/60959 |
Actions (login required)
![]() |
View Item |