Nugraha, Arafi Satria (2024) RANCANGAN TEKNIS MINE DEWATERING DAN MINE DRAINAGE DI PIT TOWNSITE BASECAMP (TSBC) TAMBANG AIR LAYA PT BUKIT ASAM Tbk TANJUNG ENIM SUMATERA SELATAN. S1 thesis, UNIVERSITAS JAMBI.
![]() |
Text
ABSTRAK.pdf Download (46kB) |
![]() |
Text
BAB I.pdf Download (53kB) |
![]() |
Text
BAB V.pdf Download (110kB) |
![]() |
Text
COVER.pdf Download (39kB) |
![]() |
Text
DAFTAR PUSTAKA.pdf Download (46kB) |
![]() |
Text
FULL SKRIPSI.pdf Restricted to Repository staff only Download (3MB) |
![]() |
Text
HALAMAN PENGESAHAN.pdf Download (421kB) |
Abstract
PT Bukit Asam, Tbk merupakan suatu Badan Usaha Milik Negara (BUMN) yang bergerak di bidang pertambangan batubara untuk memenuhi kebutuhan industri dalam negeri maupun kebutuhan luar negeri. Proses penambangan PT Bukit Asam, Tbk berhubungan langsung dengan udara, sehingga apabila terjadi hujan maka air akan masuk ke area penambangan. Kondisi aktual sump saat ini belum memiliki dimensi dan bentuk yang optimum sehingga mengakibatkan sump meluap pada saat terjadi hujan hingga menggenangi front loading overburden pada bulan Juli 2023. Keadaan aktual sistem pemompaan air pada pit TSBC pada saat pengamatan menggunakan 4 unit pompa dengan jenis pompa Multiflow MF420 dengan jam operasi pompa rata-rata 14 jam/hari. Sumber air yang masuk ke dalam pit TSBC yaitu air limpasan. Debit air limpasan sebelum dibuat saluran terbuka sebesar 54.661,59 m3/hari dengan luasan catctment area yaitu 3,225 km2 dan debit air limpasan setelah dibuat saluran terbuka sebesar 49.994,32 m3/hari dengan luasan catctment area yaitu 2,95 km2. Rekomendasi dimensi sump rencana didapatkan dari total volume tampungan sump rencana yaitu sebesar 149.982,96 m3, didapatkan berdasarkan bahwa rancangan sump tersebut dapat menampung volume air limpasan selama 3 hari tanpa dilakukan pemompaan. Jadi, dari hal tersebut dapat ditentukan dimensi rancangan sump dengan kedalaman 6 meter, panjang permukaan 164 m, lebar permukaan 164 m, panjang alas 152 m dan lebar alas 152 meter. Saluran terbuka yang direncanakan sebanyak 2 saluran terbuka yaitu saluran terbuka pada sekeliling tambang area side wall barat dan utara pit. Dengan dimensi saluran terbuka, untuk saluran 1 (barat) memiliki lebar dasar saluran 0,42 m, lebar permukaan saluran 1,6 m dan kedalaman saluran 0,6 m dengan kemiringan 45o. Sedangkan untuk saluran 2 (utara) memiliki lebar dasar saluran 0,72 m, lebar permukaan saluran 1,6 m dan kedalaman saluran 0,7 m dengan kemiringan 60o. Untuk debit aktual 1 pompa yaitu 657,8 m3/jam. Dalam perencanaan pengeringan, penulis merekomendasikan waktu kerja setiap pompa 19 jam/hari atau dengan debit pemompaan (4 pompa) sebanyak 49.992,8 m3/Hari. PT Bukit Asam, Tbk is a State-Owned Enterprise (BUMN) which operates in the coal mining sector to meet domestic and foreign industrial needs. PT Bukit Asam, Tbk's mining process is directly connected to the air, so that if it rains, water will enter the mining area. The current actual condition of the sump does not yet have optimum dimensions and shape, resulting in the sump overflowing during rain and flooding the front loading overburden in July 2023. The actual condition of the water pumping system in the TSBC pit at the time of observation used 4 pump units with the Multiflow MF420 pump type. with pump operating hours an average of 14 hours/day. The source of water that enters the TSBC pit is runoff water. The runoff water discharge before the open channel was made was 54,661.59 m3/day with a catctment area of 3,225 km2 and the runoff water discharge after the open channel was made was 49,994.32 m3/day with a catctment area of 2.95 km2. Recommendations for the dimensions of the planned sump are obtained from the total volume of the planned sump storage, namely 149,982.96 m3, obtained on the basis that the sump design can accommodate the volume of runoff water for 3 days without pumping. So, from this, the dimensions of the sump design can be determined with a depth of 6 meters, a surface length of 164 m, a surface width of 164 m, a base length of 152 m and a base width of 152 meters. The planned open channels are 2 open channels, namely open channels around the mine in the west and north side wall areas of the pit. With open channel dimensions, channel 1 (west) has a channel base width of 0.42 m, channel surface width of 1.6 m and channel depth of 0.6 m with a slope of 45o. Meanwhile, channel 2 (north) has a channel base width of 0.72 m, channel surface width of 1.6 m and channel depth of 0.7 m with a slope of 60o. The actual discharge for 1 pump is 657.8 m3/hour. In drying planning, the author recommends that the working time for each pump is 19 hours/day or with a pumping discharge (4 pumps) of 49,992.8 m3/day.
Type: | Thesis (S1) |
---|---|
Uncontrolled Keywords: | Curah Hujan, Debit Air Limpasan, Sump, Catchment Area |
Subjects: | L Education > L Education (General) |
Divisions: | Fakultas Sains dan Teknologi > Teknik Pertambangan |
Depositing User: | Nugraha |
Date Deposited: | 01 Jul 2024 06:53 |
Last Modified: | 01 Jul 2024 06:53 |
URI: | https://repository.unja.ac.id/id/eprint/65937 |
Actions (login required)
![]() |
View Item |