Kajian Teknis Pengendalian Lumpur Menggunakan Pompa Lumpur ADP 200 Pada Sump Pit 3 Banko Barat PT Bukit Asam TBK, Tanjung Enim, Sumatera Selatan

Fauziyah, Safrina Aryani (2024) Kajian Teknis Pengendalian Lumpur Menggunakan Pompa Lumpur ADP 200 Pada Sump Pit 3 Banko Barat PT Bukit Asam TBK, Tanjung Enim, Sumatera Selatan. S1 thesis, UNIVERSITAS JAMBI.

[img] Text
ABSTRAK.pdf

Download (23kB)
[img] Text
BAB 1.pdf

Download (74kB)
[img] Text
BAB 5.pdf

Download (67kB)
[img] Text
COVER.pdf

Download (40kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (24kB)
[img] Text
FULL Skripsi.pdf
Restricted to Repository staff only

Download (11MB)
[img] Text
LEMBAR PENGESAHAN .pdf

Download (225kB)
Official URL: https://repository.unja.ac.id/

Abstract

Penambangan terbuka oleh PT Bukit Asam, TBK di Bangko Barat, Tanjung Enim, Sumatera Selatan, sering kali terpengaruh oleh tingginya curah hujan yang dapat menghambat operasional. Metode penambangan ini menghasilkan cekungan besar yang berpotensi menjadi daerah penampungan air dari air permukaan maupun air tanah. Untuk mengatasi hal ini, perusahaan menggunakan pompa sentrifugal untuk mengalirkan lumpur yang terbentuk dari lempung dan lanau. Lumpur ini memiliki sifat abrasif dan mengandung padatan yang besar, memerlukan pemilihan pompa yang sesuai untuk mencegah penyumbatan. Di pit 3 sump barat, PT Bukit Asam menggunakan pompa lumpur, seperti ADP 200, untuk mengatur lumpur dan mencegah sedimentasi dalam sump. Namun, karena penggunaan pompa lumpur masih baru, perlu dilakukan kajian teknis yang mencakup metode pemompaan, berat jenis lumpur, dan debit pompa untuk memastikan efisiensi sistem. Studi ini menunjukkan bahwa pengaturan seri pompa dredger ADP 200, booster pump 1, dan booster pump 2 memiliki debit pompa aktual sebesar 734,47 m3/jam, dengan waktu operasional 5 jam per hari, menghasilkan keluaran lumpur sebesar 3.672,35 m3/hari. Efisiensi pompa ADP 200 mencapai 68%, sedangkan pompa booster DnD 150-4H menunjukkan efisiensi sebesar 71% dan 70% pada rpm yang berbeda. Berdasarkan perhitungan, pengeringan lumpur di sump pit 3 Bangko Barat membutuhkan waktu sekitar 41 hari dengan rata-rata volume lumpur keluar 3.672,35 m3/hari, dengan mengoptimalkan waktu kerja pompa selama 5 jam per hari. Studi ini penting untuk memahami teknis pengendalian lumpur menggunakan pompa lumpur ADP 200 di lingkungan operasional tambang terbuka, memberikan kontribusi terhadap efisiensi dan keberlanjutan operasional PT Bukit Asam, TBK. Kata Kunci : pompa, efesiensi pompa. Open pit mining by PT Bukit Asam, TBK in Bangko Barat, Tanjung Enim, South Sumatra, is often affected by high rainfall which can hamper operations. This mining method produces large basins which have the potential to become water storage areas from surface water and ground water. To overcome this, the company uses centrifugal pumps to drain the sludge formed from clay and silt. This sludge has abrasive properties and contains large solids, requiring appropriate pump selection to prevent blockages. In pit 3 of the west sump, PT Bukit Asam uses a mud pump, such as the ADP 200, to manage the mud and prevent sedimentation in the sump. However, because the use of mud pumps is still new, it is necessary to carry out a technical study covering the pumping method, specific gravity of the mud, and pump discharge to ensure system efficiency. This study shows that the arrangement of the ADP 200 dredger pump series, booster pump 1, and booster pump 2 has an actual pump flow rate of 734.47 m3/hour, with an operational time of 5 hours per day, resulting in a sludge output of 3,672.35 m3/day. The efficiency of the ADP 200 pump reaches 68%, while the DnD 150-4H booster pump shows an efficiency of 71% and 70% at different rpm. Based on calculations, drying the mud in sump pit 3 Bangko Barat takes around 41 days with an average volume of mud coming out of 3,672.35 m3/day, by optimizing the pump working time of 5 hours per day. This study is important to understand the technical aspects of mud control using the ADP 200 mud pump in an open pit operational environment, contributing to the operational efficiency and sustainability of PT Bukit Asam, TBK. Keywords: pump, pump efficiency.

Type: Thesis (S1)
Uncontrolled Keywords: pump, pump efficiency
Subjects: L Education > L Education (General)
Divisions: Fakultas Sains dan Teknologi > Teknik Pertambangan
Depositing User: Fauziyah
Date Deposited: 08 Jul 2024 02:51
Last Modified: 08 Jul 2024 02:51
URI: https://repository.unja.ac.id/id/eprint/66701