Prasetia, Wahyu (2024) Analisis Kelayakan Teknis dan Finansial Industri Piring Pelepah Pinang. S1 thesis, Universitas Jambi.
![]() |
Text
Abstrak.pdf Download (638kB) |
![]() |
Text
BAB 1.pdf Download (1MB) |
![]() |
Text
BAB 5.pdf Download (429kB) |
![]() |
Text
Cover.pdf Download (355kB) |
![]() |
Text
Daftar Pustaka.pdf Download (1MB) |
![]() |
Text
Halaman Pengesahan.pdf Download (694kB) |
![]() |
Text
Skripsi Wahyu Prasetia Full.pdf Restricted to Repository staff only Download (30MB) |
Abstract
Penelitian ini dilakukan untuk menganalisis kelayakan teknis dan finansial industri piring pelepah pinang. Metode penelitian yang digunakan adalah kualitatif dan kuantitatif. Aspek teknis antara lain: lokasi yang ditetapkan yaitu berada pada Kecamatan Betara Kabupaten Tanjung Jabung Barat Provinsi Jambi, ketersediaan bahan baku sebanyak 8.130.000 pelepah/tahun, kapasitas produksi sebanyak 300 pelepah/hari dengan output sebanyak 600 piring pelepah pinang, proses produksi dimulai dari penerimaan bahan baku, pencucian, penjemuran, pemotongan, pencetakan dan finishing. Tenaga kerja sebanyak 10 orang. Analisis kriteria kelayakan finansial meliputi NVP sebesar Rp 128.696.487 (NVP>0) sehingga usaha layak dijalankan. IRR sebesar 26%, PP selama 3,3 tahun, Net B/C sebesar 1,29 (Net B/C>1) sehingga usaha layak dijalankan, harga pokok produk sebesar Rp.2.845. This research was conducted to analyze the technical and financial feasibility of the areca nut plate industry. The research methods used are qualitative and quantitative. Technical aspects include: the specified location is in Betara District West Tanjung Jabung Regency Jambi Province, the availability of raw materials is 8.130.000 fronds/year, the production capacity is 300 fronds/day with an output of 600 plates of areca palm fronds, the production process starts from receiving raw materials, washing, drying, cutting, printing and finishing. The workforce is 10 people. Analysis of financial feasibility criteria includes an NVP of IDR 128.696.487 (NVP>0) so that the business is feasible to run. IRR is 26%, PP is for 3,3 years, Net B/C is 1,29 (Net B/C>1) so the business is worth running, the cost of the product is IDR 2.845.
Type: | Thesis (S1) |
---|---|
Uncontrolled Keywords: | Areca palm plate, Financial analysis and Technical analysis |
Subjects: | L Education > L Education (General) |
Divisions: | Fakultas Teknologi Pertanian > Teknologi Industri Pertanian |
Depositing User: | Prasetia |
Date Deposited: | 16 Jul 2024 07:53 |
Last Modified: | 16 Jul 2024 07:53 |
URI: | https://repository.unja.ac.id/id/eprint/68173 |
Actions (login required)
![]() |
View Item |