Perencanan Penambangan Jangka Pendek (Short Term) Three Months Rolling Plan Kuartal I Tahun 2025 Pit A1A PT Astaka Dodol Provinsi Sumatera Selatan

Sulaiman, Candra Ramadhoni (2025) Perencanan Penambangan Jangka Pendek (Short Term) Three Months Rolling Plan Kuartal I Tahun 2025 Pit A1A PT Astaka Dodol Provinsi Sumatera Selatan. S1 thesis, UNIVERSITAS JAMBI.

[img] Text
BAB I.pdf

Download (242kB)
[img] Text
BAB V.pdf

Download (233kB)
[img] Text
FULL SKRIPSI.pdf
Restricted to Repository staff only

Download (8MB)
[img] Text
HALAMAN PENGESAHAN.pdf

Download (383kB)
[img] Text
COVER.pdf

Download (132kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (235kB)
[img] Text
ABSTRAK.pdf

Download (180kB)
Official URL: https://repository.unja.ac.id/

Abstract

PT Astaka Dodol menyusun rencana penambangan bulanan melalui three months rolling plan yang disesuaikan dengan target produksi. Pada tahun 2025, target produksi akan ditingkatkan dua kali lipat dari tahun sebelumnya menjadi 2.000.000 ton batubara/tahun. Penelitian ini memiliki constraint yaitu membuat three months rolling plan pada periode Januari–Maret 2025 di Pit A1A dengan improvement yaitu akan direncakan untuk pengurangan distance hauling guna mengefisiensikan penggunaan alat. Perhitungan kapasitas produksi alat dilakukan terlebih dahulu untuk memastikan bahwa alat yang tersedia mampu untuk mencapai target produksi yang telah ditetapkan. Dari hasil estimasi didapatkan alat yang digunakan mampu achieve pada target produksi yang ditentukan dengan kemampuan produksi pada bulan Januari yaitu 217.741,32 bcm overburden dan 56.191,20 ton batubara, bulan Februari sebesar 202.085,19 bcm overburden dan 50.522,17 ton batubara serta pada bulan Maret sebesar 222.354,03 bcm overburden dan 57.803,41 ton batubara. Sequence penambangan dilakukan searah strike lapisan batubara, dari barat laut ke tenggara. Estimasi overburden dan batubara berturut-turut pada Januari–Maret yaitu 245.417,87 bcm & 57.357,02 ton; 212.053,03 bcm & 51.472,75 ton; serta 238.320,93 bcm & 58.854,75 ton. Pada kegiatan penimbunan overburden dilakukan secara bertahap dengan memperhatikan material balance, dimulai pada bulan Januari hingga elevasi RL+60 dengan volume 264.040,32 LCM, dilanjutkan pada bulan Februari hingga RL+65 dengan volume 254.984,65 LCM, dan pada bulan Maret mencapai RL+70 dengan volume sebesar 285.429,47 LCM. Kegiatan overburden removal menggunakan 3 fleet dengan total 3 unit loader dan 20 unit hauler pada Januari–Februari, lalu menjadi 18 hauler pada Maret seiring pemangkasan jarak angkut. Untuk coal getting digunakan 1 fleet dengan kombinasi 1 loader dan 3 hauler selama Januari–Maret. Hasil optimasi distance menunjukkan pengaruh peningkatan produktivitas sebesar 64% dan pengurangan penggunaan hauler. Hal ini menunjukkan jarak hauling sangat berpengaruh terhadap efektivitas alat. PT Astaka Dodol develops monthly mine planning through a three-month rolling plan aligned with production targets. In 2025, the annual coal production target is doubled from the previous year, reaching 2,000,000 tons. This study focuses on preparing the three-month rolling plan for the period of January–March 2025 at Pit A1A, with an improvement strategy aimed at reducing hauling distance to enhance equipment efficiency. Production capacity calculations were carried out to ensure that the available equipment can achieve the planned target. The results indicate that the equipment fleet is capable of meeting production requirements, with overburden removal and coal production in January amounting to 217,741.32 bcm and 56,191.20 tons, in February 202,085.19 bcm and 50,522.17 tons, and in March 222,354.03 bcm and 57,803.41 tons, respectively. The mining sequence follows the coal seam strike from northwest to southeast. The estimated overburden and coal requirements for January–March are 245,417.87 bcm and 57,357.02 tons; 212,053.03 bcm and 51,472.75 tons; and 238,320.93 bcm and 58,854.75 tons, respectively. Overburden dumping is conducted gradually in consideration of material balance, beginning in January at elevation RL+60 with 264,040.32 LCM, in February at RL+65 with 254,984.65 LCM, and in March at RL+70 with 285,429.47 LCM. Overburden removal utilizes three fleets consisting of three loaders and twenty haulers in January–February, and eighteen haulers in March following the hauling distance reduction. Coal getting is conducted with one fleet comprising one loader and three haulers throughout the study period. Optimization of hauling distance demonstrates a 64% increase in productivity and a reduction in hauler usage, confirming that hauling distance significantly influences equipment effectiveness.

Type: Thesis (S1)
Uncontrolled Keywords: Three Months Rolling Plan, Kapasitas Produksi, Sequence, Kebutuhan alat
Subjects: L Education > L Education (General)
Divisions: Fakultas Sains dan Teknologi > Teknik Pertambangan
Depositing User: SULAIMAN
Date Deposited: 02 Oct 2025 07:38
Last Modified: 02 Oct 2025 07:38
URI: https://repository.unja.ac.id/id/eprint/85998